4

 

This email address is being protected from spambots. You need JavaScript enabled to view it.

This email address is being protected from spambots. You need JavaScript enabled to view it.

Tel: +371-29361149

+371-25722631

Huge glass packet replacement

lielstikpm_1
lielstikpm_10
lielstikpm_11
lielstikpm_12
lielstikpm_13
lielstikpm_14
lielstikpm_15
lielstikpm_16
lielstikpm_17
lielstikpm_18
lielstikpm_19
lielstikpm_2
lielstikpm_20
lielstikpm_3
lielstikpm_4
lielstikpm_5
lielstikpm_6
lielstikpm_7
lielstikpm_8
lielstikpm_9
lielstikpm_21
lielstikpm_22
lielstikpm_23
lielstikpm_24
lielstikpm_25
lielstikpm_26
lielstikpm_27
lielstikpm_28
lielstikpm_29
lielstikpm_30
lielstikpm_31
lielstikpm_32
lielstikpm_33
lielstikpm_34
lielstikpm_35
lielstikpm_36
lielstikpm_37
lielstikpm_38
lielstikpm_39
lielstikpm_40
lielstikpm_41
lielstikpm_42
lielstikpm_43
lielstikpmTit_1
lielstikpmTit_2
lielstikpmTit_3
lielstikpmTit_4
nobody_m_1024x1024
01/48 
start stop bwd fwd

 

lielstikpmTit 1    The most popular contemporary material in construction is the glass and its various applications. Also, the dimensions and weight of glass and glass packets have become very large and heavy. Many buildings, in modern buildings consist of one glass. The glass insertion is very different, which varies greatly between windows and facades, and their materials. Just as small glasses used to break and ruin, it is the same with large glasses and packages. Today’s,  lielstikpmTit 2

one of the most common causes of large packet breakdowns is the TERMOSHOCK, caused by the sun by heating a large area of ​​glass packet. To avoid such heat shocks, the surface of the glass are tempered to get them 3 times higher strength. The second most common cause is mechanical damage to the package by the person or third person himself.

lielstikpmTit 3    We offer ordering and replacement of huge glass size of packets and complexity for houses. Those types of work is especially complex and requires great skills and responsibility to not damage new glass, don’t hurt themselves or others. Often this kind of work is related to the lift hoists, which are needed lielstikpmTit 4 because the glasses are heavy and they are high on the ground. In cities, this type of work must be coordinated with the municipality and must be a work permit before work is done. Each such object is carefully and individually assessed to avoid errors and misunderstandings in performing work.

Copyright © 2007-2018 MjLogi.

icon-hotline